Description
The metal parts of the blade are high-gloss polished S/S. This blade will fit almost all makes/types of wiper arms with a tang of 7.2 x 2.5 mm.
Technical data
| Manufacturer | Vetus |
| Article number | WBS51 |
| DIN tapered | Yes |
| Material | Stainless steel (AISI 316) |
| Colour | Gloss polished |
| Length (mm) | 508 |
Need help choosing the right solution or with installation? Write to us – we are happy to help.



